Call for Bids

Lorem ipsum dolor sit amet consectetur. Adipiscing lacus ut at lorem in diam auctor dictum. Nunc ullamcorper adipiscing nisl.

Jeanne D’Arc Exploration Drilling Project 2019-2027

This public registry page has been created by the C-NLOPB for the posting of documents related to Husky Oil Operations Limited (Husky) and ExxonMobil Canada Limited’s (ExxonMobil) Jeanne d’Arc Basin Exploration Drilling Project. Exxon Mobil is a proponent on this project as a result of its acquisition of a portion of exploration licence (EL) 1151 (now known as 1151A) from Husky in October 2019. The Responsible Authority (RA) for the project is the Impact Assessment Agency of Canada (IAAC). Comments on documents available for public comment should be sent to:

Jeanne D’Arc Basin Exploration Drilling Project
Impact Assessment Agency of Canada
200-1801 Hollis Street
Halifax, NS, B3J 3N4
Telephone: 902-426-0564
Fax: 902-426-6550
Email: iaac.husky.aeic@canada.ca

As the RA for this project, the IAAC website is the primary point for locating documents. In the event of discrepancies between postings on the C-NLOPB website and the IAAC website, the IAAC site should be considered accurate.

Husky Oil Operations Limited and Exxon Mobil Canada Limited
Jeanne D’Arc Basin Exploration Drilling Project
Reference No. 80130

Scroll to view more

Date Record Author

7 Jul, 2023

ExxonMobil Decision Statement Conditions Information

ExxonMobil Canada Ltd.

1 Jun, 2023

Electronic Transmittal of EA Update for 2023 Activities to NGO Fisheries

C-NLOPB

1 Jun, 2023

Electronic Transmittal of EA Update for 2023 Activities to Government

C-NLOPB

17 May, 2023

EA Update for 2023 Activities

ExxonMobil Canada Ltd.

16 Mar, 2020

Environmental Assessment Report

Impact Assessment Agency

16 Mar, 2020

Environmental Assessment Decision Statement – Husky Oil Operations Ltd

Impact Assessment Agency

16 Mar, 2020

Environmental Assessment Decision Statement – Exxon Mobil Canada Ltd.

Impact Assessment Agency

16 Mar, 2020

Public Notice – Federal Funding Allocated to Particpate in the Environmental Assessment

Impact Assessment Agency

25 Nov, 2019

Public Notice – Jeanne D’Arc Basin Exploration Drilling Project – Public Comments Invited

Impact Assessment Agency

25 Nov, 2019

News Release – Jeanne D’Arc Basin Exploration Drilling Project – Public Comments Invited

Impact Assessment Agency

25 Nov, 2019

Draft Environmental Assessment Conditions – Exxon

Impact Assessment Agency

25 Nov, 2019

Draft Environmental Assessment Conditions – Husky

Impact Assessment Agency

25 Nov, 2019

Draft Environmental Assessment Report

Impact Assessment Agency

15 Nov, 2019

Response to Information Request Related to Exploration Licence 1151

Impact Assessment Agency

14 Aug, 2019

Conformity of Responses to Information Requests Related to the Environmental Impact Statement Round II

Canadian Environmental Assessment Agency

9 Aug, 2019

Responses to Information Requests Related to the Environmental Impact Statement Round II

Husky Oil Operations Ltd.

12 Jul, 2019

Information Requests Related to the Environmental Impact Statement Round II

Canadian Environmental Assessment Agency

5 Jul, 2019

Outcome of Conformity Review of Revised Responses to Non-conforming Round I Information Requirements for the Proposed Husky Energy Exploration Drilling Project

Canadian Environmental Assessment Agency

21 Jun, 2019

Revised Responses to Information Requests Related to the Environmental Impact Statement Round 1

Husky Oil Operations Ltd.

25 Apr, 2019

Conformity of Responses to Information Requests Related to the Environmental Impact Statement Round 1

Canadian Environmental Assessment Agency

21 Mar, 2019

Responses to Information Requests Related to the Environmental Impact Statement Round 1

Husky Oil Operations Ltd.

21 Dec, 2018

Information Requests Related to the Environmental Impact Statement Round 1

Canadian Environmental Assessment Agency

11 Oct, 2018

Conformity of the Environmental Impact Statement

Canadian Environmental Assessment Agency

11 Oct, 2018

News Release Husky Energy Exploration Drilling Project — Public Comments Invited

Canadian Environmental Assessment Agency

11 Oct, 2018

Public Notice Husky Energy Exploration Drilling Project — Public Comments Invited

Canadian Environmental Assessment Agency

7 Sep, 2018

Environmental Impact Statement

Husky Oil Operations Ltd.

31 May, 2018

Updated Environmental Impact Statement Guidelines

Canadian Environmental Assessment Agency

31 May, 2018

Response to Changes to Husky Energy’s Designated Project Re: Exploration Licence 1155

Canadian Environmental Assessment Agency

30 Apr, 2018

Changes to Husky Energy’s Designated Project Re: Exploration Licences 1121 and 1155

Canadian Environmental Assessment Agency

16 Apr, 2018

Changes to Husky Energy’s Designated Project

Husky Oil Operations Ltd.

23 Mar, 2018

Transfer of Ownership of Exploration Licence 1134

Canadian Environmental Assessment Agency

28 Aug, 2017

Public Notice Husky Energy Exploration Drilling Project — Additional Participant Funding Allocated

Canadian Environmental Assessment Agency

27 Jul, 2017

Additional Information Requirements Regarding Engagement with Indigenous Groups

Canadian Environmental Assessment Agency

16 May, 2017

Non-Conformity of the Environmental Impact Statement

Canadian Environmental Assessment Agency

27 Apr, 2017

Additional Information Requirements Regarding Engagement with Indigenous Groups

Canadian Environmental Assessment Agency

27 Mar, 2017

Final Environmental Impact Statement Guidelines-Updated to include ELs 1151 and 1152

Canadian Environmental Assessment Agency

27 Mar, 2017

Inclusion of ELs 1151 and 1152 in Scope of the Husky Energy Exploration Drilling Project

Canadian Environmental Assessment Agency

14 Mar, 2017

News Release Husky Energy Exploration Drilling Project Federal Funding Allocated

Husky Oil Operations Ltd.

20 Feb, 2017

Information Requirements for Inclusion of Husky Energy’s New Parcels into the Husky Energy Exploration Drilling Project

Husky Oil Operations Ltd.

20 Dec, 2016

Public Notice Federal Funding Available

Canadian Environmental Assessment Agency

20 Dec, 2016

News Release Federal Funding Available

Canadian Environmental Assessment Agency

9 Dec, 2016

Final Environmental Impact Statement Guidelines

Canadian Environmental Assessment Agency

28 Oct, 2016

Public Notice – Public Comments Invited on the Draft Environmental Impact Statement Guidelines

Canadian Environmental Assessment Agency

28 Oct, 2016

Draft Environmental Impact Statement Guidelines

Canadian Environmental Assessment Agency

28 Oct, 2016

News Release – Public Comments Invited on the Draft Environmental Impact Statement Guidelines

Canadian Environmental Assessment Agency

28 Oct, 2016

Notice of Commencement of an Environmental Assessment

Canadian Environmental Assessment Agency

28 Oct, 2016

Notice of Environmental Assessment Determination

Canadian Environmental Assessment Agency

13 SEP, 2016

Public Notice – Public Comments Invited on a Summary of the Project Description

Canadian Environmental Assessment Agency

13 SEP, 2016

News Release – Public Comments Invited on a Summary of the Project Description

Canadian Environmental Assessment Agency

1 SEP, 2016

Summary of a Project Description of a Designated Project

Husky Oil Operations Ltd.

1 SEP, 2016

Project Description of a Designated Project

Husky Oil Operations Ltd.

Scroll to view more

Operator Project CEAR # Status

BP Canada Energy Group ULC

BP Canada Energy Group ULC – Ephesus Prospect Controlled Source Electromagnetic (CSEM) Survey 2020-2024

Completed

BHP Canada

BHP Canada EXPL Drilling Project EL 1157 and 1158 Seabed Survey 2020-2025

Completed

Equinor Canada Ltd.

Equinor Canada Ltd. Central Ridge Exploration Drilling Project 2020-2029

80175

Completed

BP Canada Energy Group ULC

BP Canada Energy Group ULC – Ephesus Prospect ROV Survey 2019-2024

2022 EA Update Received

Equinor Canada Ltd.

Equinor Bay du Nord Development Project

80154

Completed

BP Canada Energy Group

BP Canada Energy Group ULC Newfoundland Orphan Basin Exploration Drilling Program, 2017-2026

80147

Completed

ExxonMobil Canada Ltd.

ExxonMobil Canada Limited Eastern Newfoundland Offshore Exploration Drilling Project 2018-2030

80132

2022 EA Update Received

Husky Oil Operations Limited and ExxonMobil Canada Limited

Jeanne D’Arc Exploration Drilling Project 2019-2027

80130

Completed

Equinor Canada Ltd. (formerly known as Statoil Canada Ltd.)

Equinor Canada Ltd. (Statoil Canada Ltd.) Flemish Pass Exploration Drilling Project 2018-2028

80129

Completed

Fugro GeoSurveys

Fugro GeoSurveys Offshore Seafloor and Seep Sampling Program, 2017-2027

Completed

Seitel’s

Seitel’s East Coast Offshore 2D 3D 4D Seismic Program 2016-2025

Completed

CGG

CGG Services (Canada) Inc. Newfoundland Offshore 2D 3D 4D Seismic Program 2016-2025

Completed

ExxonMobil

ExxonMobil Canada Eastern NL Geophysical Program 2015-2024

2022 EA Update Received

WesternGeco

WesternGeco Canada Eastern Newfoundland Offshore Seismic Program, 2015 to 2024

Undergoing Amendment

WesternGeco

WesternGeco Canada Southeastern Newfoundland Offshore Seismic Program, 2015 to 2024

Undergoing Amendment

Suncor Energy Inc

Suncor Energy’s Eastern Newfoundland Offshore Area 2D/3D/4D Seismic Program, 2014-2024

Completed

MG3

MG3 (Survey) UK Limited Offshore Labrador Geochemical and Seabed Sampling Program 2015-2024

Completed

Hibernia Management and Development Company Ltd.

Hibernia Management and Development Company Ltd. 2D/3D/4D Seismic Projects for the Hibernia Oil and Gas Production Field, 2013 to Remaining Life of Field

Completed

Husky Oil Operations Limited

Husky Oil Operations Limited White Rose Extension Project

12-01-68249

Completed

ExxonMobil Canada Properties

ExxonMobil Canada Properties Hebron Development Project

09-03-46144

Completed

HMDC

Hibernia Drill Centres Construction and Operations Program

08-01-42279

Completed

Petro-Canada

Terra Nova VSP Program

06-01-18277

Completed

Husky Energy

Husky Energy Drill Centre Construction Installation and Operation Program

06-01-17410

Completed

Back to top
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.