Call for Bids

Lorem ipsum dolor sit amet consectetur. Adipiscing lacus ut at lorem in diam auctor dictum. Nunc ullamcorper adipiscing nisl.

Husky Oil Operations Limited White Rose Extension Project

Husky Oil Operations Limited
CEAR No. 12-01-68249

Husky Oil Operations Limited, on behalf of its co-venturers, is proposing the White Rose Extension Project (WREP) at the White Rose Field, northeast Grand Banks. A Wellhead Platform (WHP) option will include activities associated with engineering, procurement, construction, fabrication, installation, commissioning, development drilling, operations and maintenance, decommissioning of a concrete gravity structure (CGS), and construction of up to three drill centres. The WHP will involve construction activities at two locations, the White Rose Field and Argentia, Placentia Bay. A subsea drill centre development option will include development of the West White Rose drill centre and construction of up to three additional subsea drill centres. Drilling of the subsea wells will be done from a mobile offshore drilling unit (MODU). Both development options will be tied back to the existing SeaRose floating production, storage and offloading (FPSO) vessel. Construction activities are scheduled to commence in 2013, with petroleum production to begin in 2016 or 2017.

The project was listed on the Inclusion List Regulations under the Canadian Environmental Assessment Act (S.C. 1992, c. 37)(CEAA) and required a Screening level of assessment. On July 6, 2012, the Minister of the Environment designated the project pursuant to subsections 124(2) and 14(2) of the Canadian Environmental Assessment Act, 2012 (CEAA 2012), so the screening for the project must be continued and completed under the CEAA. C-NLOPB, as the Responsible Authority (RA) respecting the project, must take a course of action under section 20 of the CEAA no later than 365 days after the day on which CEAA 2012 came into force. Pursuant to subsection 124(4) of CEAA 2012, the period taken by a proponent to comply with a request made by an RA to collect information or undertake a study is not included in the calculation of that time limit.

The following is a list of documents available on the C-NLOPB public registry for the project.

Scroll to view more

Date Record Author

20 Feb, 2025

2025 Environmental Assessment Update

Cenovus Energy

13 May, 2024

2024 Environmental Assessment Update

Cenovus Energy

8 Apr, 2024

Letter of Determination

C-NLOPB

21 Mar, 2024

Electronic Transmittal to DFO

C-NLOPB

13 Mar, 2024

Revised responses to comments on EA Amendment

Cenovus Energy

13 Mar, 2024

Submission of Revised responses to comments on EA Amendment

Cenovus Energy

11 Mar, 2024

Electronic Transmittal to Cenovus

C-NLOPB

8 Mar, 2024

Reply to Revised responses to comments on EA Amendment

DFO

19 Feb, 2024

Electronic Transmittal to DFO

C-NLOPB

12 Feb, 2024

Revised responses to comments on EA Amendment

Cenovus Energy

12 Feb, 2024

Submission of Revised responses to comments on EA Amendment

Cenovus Energy

18 Dec, 2023

Electronic Transmittal to Cenovus

C-NLOPB

15 Dec, 2023

Reply to Responses to comments on EA Amendment

DFO

13 Sep, 2023

Electronic Transmittal response to DFO

C-NLOPB

8 Sep, 2023

Response to Consolidated Comments on EA Amendment

Cenovus Energy

8 Sep, 2023

Submission of Responses to Consolidated Comments on EA Amendment

Cenovus Energy

16 Jun, 2023

Consolidated Comments on EA Amendment

C-NLOPB

16 Jun, 2023

Transmittal of Consolidated Comments on EA Amendment

C-NLOPB

8 Jun, 2023

Response to EA Amendment

DFO

7 Jun, 2023

Response to EA Amendment

FFAW

17 May, 2023

Transmittal of EA Amendment to NGO Fisheries

C-NLOPB

17 May, 2023

Transmittal of EA Amendment to Government

C-NLOPB

12 Apr, 2023

EA Amendment

Cenovus Energy

12 Apr, 2023

Submission of EA Amendment

Cenovus Energy

18 Sep, 2013

Letter of Determination

C-NLOPB

10 Sep, 2013

Screening Report

C-NLOPB

2 Aug, 2013

Final Consolidated Addendum and Appendices

Husky Energy

2 Aug, 2013

Submission of Final Consolidated Addendum and Appendices

Husky Energy

1 Aug, 2013

Reply to Husky’s Response to Review Comments on the EA Addendum

EC

19 Jul, 2013

Reply to Husky’s Response to Review Comments on the EA Addendum

FFAW

5 Jul, 2013

Reply to Husky’s Response to Review Comments on the EA Addendum

TC

2 Jul, 2013

Reply to Husky’s Response to Review Comments on the EA Addendum

DFO

27 Jun, 2013

Transmittal of Response to Review Comments on the EA Addendum to FFAW

C-NLOPB

27 Jun, 2013

Transmittal of Response to Review Comments on the EA Addendum to Governments and Agencies

C-NLOPB

26 Jun, 2013

Response to Review Comments on the EA Addendum

Husky Energy

26 Jun, 2013

Submission of Response to Review Comments on the EA Addendum

Husky Energy

24 May, 2013

Transmittal of Partial Comments on the EA Addendum to Husky

C-NLOPB

24 May, 2013

Partial Comments on the EA Addendum to Husky

C-NLOPB

17 May, 2013

Response to EA Addendum

FFAW

14 May, 2013

Response to EA Addendum

EC

10 May, 2013

Response to EA Addendum

DND

5 May, 2013

Response to EA Addendum

DFO

2 May, 2013

Response to EA Addendum

TC

23 Apr, 2013

Transmittal of EA Addendum to FFAW and One Ocean

C-NLOPB

23 Apr, 2013

Transmittal of EA Addendum to Governments and Agencies

C-NLOPB

23 Apr, 2013

EA Addendum (File > 11MB)

Husky Energy

22 Apr, 2013

Submission of EA Addendum

Husky Energy

15 Mar, 2013

Electronic Transmittal of Consolidated Comments

C-NLOPB

15 Mar, 2013

Consolidated Comments on EA Report Transmittal Letter

C-NLOPB

15 Mar, 2013

Consolidated Comments on EA Report

C-NLOPB

6 Mar, 2013

Response to WREP EA Report

EC

1 Mar, 2013

Response to WREP EA Report

DFO

28 Feb, 2013

Response to WREP EA Report

NRCan

21 Feb, 2013

Response to WREP EA Report

FFAW

18 Feb, 2013

Response to WREP EA Report

NL DEC

13 Feb, 2013

Response to WREP EA Report

TC

7 Feb, 2013

Response to WREP EA Report

DND

21 Dec, 2012

Letter to the FFAW and One Ocean Requesting Comments on WREP EA Report

C-NLOPB

21 Dec, 2012

Letter to Government Requesting Comments on WREP EA Report

C-NLOPB

20 Dec, 2012

WREP EA Report and Supporting Documents

Supporting Documents

Husky Energy

20 Dec, 2012

Submission Letter for WREP EA Report

Husky Energy

18 Dec, 2012

Transmittal Letter of Final Scoping Document

C-NLOPB

18 Dec, 2012

Final Scoping Document

C-NLOPB

3 Dec, 2012

Provincial Minister of the Environment Letter to C-NLOPB for Harmonized Assessment

NL DEC

29 Nov, 2012

Provincial Environmental Assessment Committee Draft Scoping Document Comments

Gov of NL

23 Nov, 2012

Letter to NL DEC Concerning Harmonized Environmental Assessment

C-NLOPB

9 Nov, 2012

Harmonized Environmental Assessment for NL, CEAA Requirements

NL DEC

2 Nov, 2012

FEAC Agreement between CEAA and C-NLOPB

C-NLOPB and CEAA

30 Oct, 2012

Provincial Minister of Environment and Conservation Letter to Husky that an EPR is Required

NL DEC

25 Jul, 2012

FCR Response

Parks Canada

23 Jul, 2012

FCR Response

NRCan

17 Jul, 2012

Letter to Malcolm Maclean Regarding White Rose Extension Project and changes to CEAA

C-NLOPB

16 Jul, 2012

FCR Response

TC

9 Jul, 2012

Comments on Draft Scoping Document and Attachments

EC

26 Jun, 2012

FCR Section 6 Form Response

EC

22 Jun, 2012

FCR Response

Industry Canada

20 Jun, 2012

FCR Response and Comments on Draft Scoping Document

DFO

20 Jun, 2012

FCR Response

NL DNR

19 Jun, 2012

FCR Response

HC

19 Jun, 2012

FCR Response

NL DEC

8 Jun, 2012

FCR Response and Explosives Questionnaire

NRCan

7 Jun, 2012

FCR Response

C-NLOPB

7 Jun, 2012

Draft Scoping Document

C-NLOPB

28 May, 2012

Project Description

Husky Energy

28 May, 2012

Submission Letter

Husky Energy

Scroll to view more

Operator Project CEAR # Status

BP Canada Energy Group ULC

BP Canada Energy Group ULC – Ephesus Prospect Controlled Source Electromagnetic (CSEM) Survey 2020-2024

Completed

BHP Canada

BHP Canada EXPL Drilling Project EL 1157 and 1158 Seabed Survey 2020-2025

Completed

Equinor Canada Ltd.

Equinor Canada Ltd. Central Ridge Exploration Drilling Project 2020-2029

80175

Completed

BP Canada Energy Group ULC

BP Canada Energy Group ULC – Ephesus Prospect ROV Survey 2019-2024

2022 EA Update Received

Equinor Canada Ltd.

Equinor Bay du Nord Development Project

80154

Completed

BP Canada Energy Group

BP Canada Energy Group ULC Newfoundland Orphan Basin Exploration Drilling Program, 2017-2026

80147

Completed

ExxonMobil Canada Ltd.

ExxonMobil Canada Limited Eastern Newfoundland Offshore Exploration Drilling Project 2018-2030

80132

2022 EA Update Received

Husky Oil Operations Limited and ExxonMobil Canada Limited

Jeanne D’Arc Exploration Drilling Project 2019-2027

80130

Completed

Equinor Canada Ltd. (formerly known as Statoil Canada Ltd.)

Equinor Canada Ltd. (Statoil Canada Ltd.) Flemish Pass Exploration Drilling Project 2018-2028

80129

Completed

Fugro GeoSurveys

Fugro GeoSurveys Offshore Seafloor and Seep Sampling Program, 2017-2027

Completed

Seitel’s

Seitel’s East Coast Offshore 2D 3D 4D Seismic Program 2016-2025

Completed

CGG

CGG Services (Canada) Inc. Newfoundland Offshore 2D 3D 4D Seismic Program 2016-2025

Completed

ExxonMobil

ExxonMobil Canada Eastern NL Geophysical Program 2015-2024

2022 EA Update Received

WesternGeco

WesternGeco Canada Eastern Newfoundland Offshore Seismic Program, 2015 to 2024

Undergoing Amendment

WesternGeco

WesternGeco Canada Southeastern Newfoundland Offshore Seismic Program, 2015 to 2024

Undergoing Amendment

Suncor Energy Inc

Suncor Energy’s Eastern Newfoundland Offshore Area 2D/3D/4D Seismic Program, 2014-2024

Completed

MG3

MG3 (Survey) UK Limited Offshore Labrador Geochemical and Seabed Sampling Program 2015-2024

Completed

Hibernia Management and Development Company Ltd.

Hibernia Management and Development Company Ltd. 2D/3D/4D Seismic Projects for the Hibernia Oil and Gas Production Field, 2013 to Remaining Life of Field

Completed

Husky Oil Operations Limited

Husky Oil Operations Limited White Rose Extension Project

12-01-68249

Completed

ExxonMobil Canada Properties

ExxonMobil Canada Properties Hebron Development Project

09-03-46144

Completed

HMDC

Hibernia Drill Centres Construction and Operations Program

08-01-42279

Completed

Petro-Canada

Terra Nova VSP Program

06-01-18277

Completed

Husky Energy

Husky Energy Drill Centre Construction Installation and Operation Program

06-01-17410

Completed

Back to top
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.