Equinor Bay du Nord Development Project

This public registry page has been created by the C-NLOPB for the posting of documents related to Equinor Canada Ltd.’s (formerly Statoil Canada Ltd.) Bay du Nord Development Project in the Flemish Pass Basin area. The Responsible Authority (RA) for the project is the Impact Assessment Agency of Canada (IAAC) so comments on documents available for public comment should be sent to:

Bay du Nord Development Project
Impact Assessment Agency of Canada
200-1801 Hollis Street
Halifax, Nova Scotia B3J 3N4
Telephone: 902-426-0564
Fax: 902-426-6550
Email: CEAA.BayDuNord.ACEE@ceaa-acee.gc.ca

As the RA for this project, the IAAC webpage is the primary point for locating documents, and in the event of discrepancies between postings on the C-NLOPB Public Registry and the IAAC site, the IAAC site should be considered accurate.

Equinor Canada Ltd.
Equinor Canada Ltd.’s (formerly Statoil Canada Ltd.) Bay du Nord Development Project
Reference No. 80154

Scroll to view more

Date Record Author

18 MAY, 2023

Environmental Assessment Conditions Information

Equinor Canada Ltd.

6 APR, 2022

Environmental Assessment Decision Statement

Impact Assessment Agency of Canada

6 APR, 2022

Environmental Assessment Report

Impact Assessment Agency of Canada

6 APR, 2022

News Release – Government Accepts Agency’s Recommendation on Bay du Nord Development Project, Subject to the Strongest Environmental GHG Condition Ever

Impact Assessment Agency of Canada

5 APR, 2022

Say No to Bay du Nord Project!

Calli Telford

4 APR, 2022

Read the IPCC report

Timothy Vesely

10 MAR, 2022

Economic catastrophe for Newfoundland and Labrador

Stephen Goulding

10 MAR, 2022

Approve Bay du Nord – Newfoundland and Labrador’s Future Depends on it

Kristopher Drodge

10 MAR, 2022

Please Do Not Approve the Baie Du Nord Project

Donald Beattie

7 MAR, 2022

Reject Bay du Nord

Bria Aird

5 MAR, 2022

Assessment: Bay du Nord Development Project will put Canada at serious risk of civil and possibly criminal litigation

Mark Simmons

4 MAR, 2022

Investing in oil & gas infrastructure at this critical moment is unconscionable

Rebecca Marchand-Smith

4 MAR, 2022

Bay du Nord Development Project Extension of the Time Limit for Decision- Making

Impact Assessment Agency of Canada

3 MAR, 2022

Comment on the Bay du Nord Development Project

University of Waterloo Environmental Assessment Review Society

2 MAR, 2022

Something is wrong

Robert Kraft

21 FEB, 2022

Je suis contre le projet de construction d’une nouvelle plateforme de forage en mer à Bay du Nord, Terre-Neuve

Marise Mathieu

20 FEB, 2022

Refus du projet pétrolier Baie du Nord

Ariane Thériault

20 FEB, 2022

No Fossil Fuel Development in Bay du Nord

For Our Kids Montreal

2 FEB, 2022

Environmental Assessment of the Bay du Nord Development Project and the Canadian Science Advisory Secretariat Science Response Report

Fisheries and Oceans Canada

28 JAN, 2022

Response to application by Bay Du Nord development Project

Theresa Clinton

6 DEC, 2021

Bay du Nord Development Project Extension of the Time Limit for Decision-Making

Impact Assessment Agency of Canada

7 OCT, 2021

Comments on the Bay du Nord EA and Draft Conditions

Wolastoqey Nation in New Brunswick

17 SEP, 2021

Comments on Draft EA Report- Bay du Nord Development Project

NCC

14 SEP, 2021

Technical Review of the Draft Environmental Assessment Report and Potential Conditions of the Bay du Nord Development Project

MTI

10 SEP, 2021

RE: Bay du Nord Development Project – Invitation to Comment on Draft EA Report

Kwilmu’kw Maw-klusuaqn Negotiation Office (KMKNO)

8 SEP, 2021

Bay du Nord Development Project – comments

CAPP

8 SEP, 2021

Environmental Assessment Report and Potential Conditions – Public Comments

FFAW

8 SEP, 2021

Review and Comments on the Draft Environmental Assessment Report and Potential Conditions

MFN

8 SEP, 2021

WWF-Canada comments on Bay du Nord EA Report

WWF-Canada

8 SEP, 2021

Equinor Submission-Comments on DEAR and Potential Conditions

Equinor Canada Ltd

7 SEP, 2021

Submission from NOIA regarding the Environmental Assessment Report for the Bay du Nord Development Project

NOIA

7 SEP, 2021

Qalipu First Nation Comments on the Bay du Nord Development Project’s Draft EA Report and Potential EA Conditions

QFN

31 AUG, 2021

Projet de d’exploitation de Bay du Nord – Invitation à commenter l’ébauche du rapport d’évaluation environnementale

Première nation de Innus de Nutashkuan

27 AUG, 2021

No, no, and no.

Lucie Mayer

19 AUG, 2021

L’avenir n’est pas dans les énergies fossiles

Le Regroupement Vigilance Hydrocarbures Québec (RVHQ)

17 AUG, 2021

Je m’oppose à ce projet

Citoyenne

15 AUG, 2021

Forage puits pétrole en mer est T-N

Pierre Bourget

14 AUG, 2021

Un cadre d’analyse à revoir

Louise Morand

9 AUG, 2021

Public Notice – Public Comments Invited on the Draft Environmental Assessment Report

Impact Assessment Agency of Canada

9 AUG, 2021

Draft Environmental Assessment Report

Impact Assessment Agency of Canada

9 AUG, 2021

Potential Environmental Assessment Conditions

Impact Assessment Agency of Canada

14 DEC, 2020

From the Impact Assessment Agency of Canada to Equinor Canada Ltd. re: Technical Review of Information Requirements

Impact Assessment Agency of Canada

9 DEC, 2020

From Equinor Canada Ltd. to the Impact Assessment Agency of Canada re: Response to Information Requirements

Equinor Canada Ltd

26 OCT, 2020

From the Impact Assessment Agency of Canada to Equinor Canada Ltd. re: Bay du Nord Development Project– Information Requirements

Impact Assessment Agency of Canada

23 OCT, 2020

Comment on the Proposed Bay du Nord Development Project

Woodstock First Nation

13 OCT, 2020

Comment on the Proposed Bay du Nord Development Project

NunatuKavut Community Council (NCC)

7 OCT, 2020

Comment on the Proposed Bay du Nord Development Project

Wolastoqey Nation in New Brunswick

30 SEP, 2020

Comment on the Proposed Bay du Nord Development Project

Mi’gmawei Mawio’mi Secretariat (MMS)

28 SEP, 2020

Review of the Environmental Impact Statement of the Bay du Nord Development Project

Kwilmu’kw Maw-klusuaqn Negotiation Office (KMKNO)

16 SEP, 2020

Technical Review & Assessment of the Summary of the Environmental Impact Statement

Mi’gmawe’l Tplu’taqnn Inc.

15 SEP, 2020

Comments on the Bay du Nord Production Project EIS – Virtual Meeting Follow Up

Nature NL

14 SEP, 2020

WWF-Canada comment submission on Bay du Nord Environmental Impact Statement

WWF-Canada

13 SEP, 2020

Comments on the Bay du Nord Production Project EIS

FFAW

13 SEP, 2020

Comments on the Bay du Nord Production Project EIS

Sierra Club Canada Foundation

13 SEP, 2020

Comments on the Bay du Nord Production Project EIS

Sierra Club Canada Foundation

13 SEP, 2020

Noia Bay du Nord EIS Submission

NOIA

13 SEP, 2020

Submission for Public Comment – Bay du Nord Project

Trades NL

13 SEP, 2020

MFN comments on the Bay du Nord EIS

Miawpukek First Nation

10 SEP, 2020

Comments on the Bay du Nord Production Project EIS

Qalipu First Nation (QFN)

8 SEP, 2020

Mémoire Nutashkuan sur projet exploitation Bay du Nord

Première Nation des Innus de Nutashkuan

12 AUG, 2020

Meeting Notes from virtual public meeting: Indigenous Groups

Impact Assessment Agency of Canada

11 AUG, 2020

Meeting Notes from virtual public meeting: Stakeholders

Impact Assessment Agency of Canada

30 JUL, 2020

Public Notice Bay du Nord Development Project — Public Comments Invited

Impact Assessment Agency of Canada

30 JUL, 2020

News Release Bay du Nord Development Project – Public Comments Invited

Impact Assessment Agency of Canada

10 JUL, 2020

Final Environmental Impact Statement

Equinor Canada Ltd

10 JUL, 2020

Summary of the Environmental Impact Statement

Equinor Canada Ltd

13 FEB, 2020

Key Outstanding Issues to Discuss with Proponent

Equinor Canada Ltd

15 NOV, 2019

Responses to Regulatory Review Information Requests

Equinor Canada Ltd

20 FEB, 2019

Memorandum of Understanding

Canadian Environmental Assessment Agency

4 JAN, 2019

News Release Bay du Nord Development Project — Participant Funding Allocated

Canadian Environmental Assessment Agency

3 OCT, 2018

News Release – Federal Funding Available

Canadian Environmental Assessment Agency

3 OCT, 2018

Public Notice – Federal Funding Available

Canadian Environmental Assessment Agency

26 SEP, 2018

Final Environmental Impact Statement Guidelines

Canadian Environmental Assessment Agency

9 AUG, 2018

Draft Environmental Impact Statement Guidelines

Canadian Environmental Assessment Agency

9 AUG, 2018

News Release Bay du Nord Development Project — Public Comments Invited

Canadian Environmental Assessment Agency

9 AUG, 2018

Public Notice Bay du Nord Development Project — Public Comments Invited

Canadian Environmental Assessment Agency

9 AUG, 2018

Notice of Commencement of an Environmental Assessment

Canadian Environmental Assessment Agency

9 AUG, 2018

Notice of Environmental Assessment Determination

Canadian Environmental Assessment Agency

25 JUN, 2018

Public Notice Bay du Nord Development Project – Public Comments Invited

Canadian Environmental Assessment Agency

25 JUN, 2018

News Release Bay du Nord Development Project – Public Comments Invited

Canadian Environmental Assessment Agency

22 JUN, 2018

Project Description of a Designated Project

Equinor Canada Ltd

22 JUN, 2018

Summary of a Project Description of a Designated Project

Equinor Canada Ltd

Scroll to view more

Operator Project CEAR # Status

BP Canada Energy Group ULC

BP Canada Energy Group ULC – Ephesus Prospect Controlled Source Electromagnetic (CSEM) Survey 2020-2024

Completed

BHP Canada

BHP Canada EXPL Drilling Project EL 1157 and 1158 Seabed Survey 2020-2025

Completed

Equinor Canada Ltd.

Equinor Canada Ltd. Central Ridge Exploration Drilling Project 2020-2029

80175

Completed

BP Canada Energy Group ULC

BP Canada Energy Group ULC – Ephesus Prospect ROV Survey 2019-2024

2022 EA Update Received

Equinor Canada Ltd.

Equinor Bay du Nord Development Project

80154

Completed

BP Canada Energy Group

BP Canada Energy Group ULC Newfoundland Orphan Basin Exploration Drilling Program, 2017-2026

80147

Completed

ExxonMobil Canada Ltd.

ExxonMobil Canada Limited Eastern Newfoundland Offshore Exploration Drilling Project 2018-2030

80132

2022 EA Update Received

Husky Oil Operations Limited and ExxonMobil Canada Limited

Jeanne D’Arc Exploration Drilling Project 2019-2027

80130

Completed

Equinor Canada Ltd. (formerly known as Statoil Canada Ltd.)

Equinor Canada Ltd. (Statoil Canada Ltd.) Flemish Pass Exploration Drilling Project 2018-2028

80129

Completed

Fugro GeoSurveys

Fugro GeoSurveys Offshore Seafloor and Seep Sampling Program, 2017-2027

Completed

Seitel’s

Seitel’s East Coast Offshore 2D 3D 4D Seismic Program 2016-2025

Completed

CGG

CGG Services (Canada) Inc. Newfoundland Offshore 2D 3D 4D Seismic Program 2016-2025

Completed

ExxonMobil

ExxonMobil Canada Eastern NL Geophysical Program 2015-2024

2022 EA Update Received

WesternGeco

WesternGeco Canada Eastern Newfoundland Offshore Seismic Program, 2015 to 2024

Undergoing Amendment

WesternGeco

WesternGeco Canada Southeastern Newfoundland Offshore Seismic Program, 2015 to 2024

Undergoing Amendment

Suncor Energy Inc

Suncor Energy’s Eastern Newfoundland Offshore Area 2D/3D/4D Seismic Program, 2014-2024

Completed

MG3

MG3 (Survey) UK Limited Offshore Labrador Geochemical and Seabed Sampling Program 2015-2024

Completed

Hibernia Management and Development Company Ltd.

Hibernia Management and Development Company Ltd. 2D/3D/4D Seismic Projects for the Hibernia Oil and Gas Production Field, 2013 to Remaining Life of Field

Completed

Husky Oil Operations Limited

Husky Oil Operations Limited White Rose Extension Project

12-01-68249

Completed

ExxonMobil Canada Properties

ExxonMobil Canada Properties Hebron Development Project

09-03-46144

Completed

HMDC

Hibernia Drill Centres Construction and Operations Program

08-01-42279

Completed

Petro-Canada

Terra Nova VSP Program

06-01-18277

Completed

Husky Energy

Husky Energy Drill Centre Construction Installation and Operation Program

06-01-17410

Completed